Djamel Zekkar
From
£150
Verified, insured, DBS checked. Card charged only when your engineer accepts.
2 verified electricians cover Brighton. Enter the property postcode to see their prices and free dates.
No account needed to see prices. Pay securely by card, Apple Pay or Google Pay.
Identity, qualifications and insurance checked by RentalComply. Prices are fixed and shown before you pay.
From
£150
From
£112.50
Ready to book your EICR?
Fixed prices from £112.50
An EICR in Brighton costs from £112.50 for a studio up to £312.50 for a 5+ bedroom property on RentalComply, from 2 verified electricians covering the area. It usually takes a few hours, depending on the size of the property and the number of circuits.
| Property size | Price range |
|---|---|
| Studio | £112.50 - £150 |
| 1 bedroom | £150 |
| 2 bedrooms | £150 - £187.50 |
| 3 bedrooms | £150 - £225 |
| 4 bedrooms | £175 - £250 |
| 5+ bedrooms | £187.50 - £312.50 |
Fixed prices set by 2 verified electricians covering Brighton, as of November 2026. The full price you pay when you book. EICR price guide
Compare prices, reviews and distance from verified engineers near you.
Book a slot that suits you and pay securely online.
Your engineer visits, completes the job and uploads your certificate.
We check each engineer's qualifications, insurance, ID and DBS before they can take bookings, and keep track of renewal dates so nothing lapses.
An EICR in Brighton costs from £112.50 for a studio up to £312.50 for a 5+ bedroom property on RentalComply, from 2 verified electricians covering the area. It usually takes a few hours, depending on the size of the property and the number of circuits. Each electrician sets a fixed price by property size, so you see the full price before you book.
Under the Electrical Safety Standards in the Private Rented Sector (England) Regulations 2020, landlords must have the electrical installation inspected and tested at least every five years, or sooner if the previous report says so.
In England, give a copy to existing tenants within 28 days of the inspection, to new tenants before they move in, and to the local council within 7 days if they ask for it. Any remedial work must be completed within 28 days, or sooner if the report says so.
Most homes take a few hours, depending on the size of the property and the number of circuits. The power will be off for parts of the inspection, so let your tenants know.
The report codes each fault: C1 (danger present) and C2 (potentially dangerous) or FI (further investigation needed) make the report unsatisfactory, and the work must be put right. C3 items are recommended improvements only.
Qualified electricians who cover Brighton. Before any engineer can take bookings on RentalComply we check their qualifications, insurance, ID and DBS.